The Golden Pacific Powerlink
SDG&E's proposed new 500 kV overhead line from the Imperial Valley to the coast near San Onofre, across Anza-Borrego Desert State Park and the backcountry.
Facts as of November 11, 2026. Every source is linked at stopgoldenpacific.org. Corrections: coalition@stopgpp.org.
Where things stand
- Application
- Not filed yet
- Expected
- By the end of 2026, possibly by mid-November
- Then
- 30 days from its CPUC Daily Calendar notice to protest and become a party
- Open right now
- No formal CPUC comment period
Sources: Daily Calendar, latest issue (new applications are listed here first); Golden Pacific Powerlink project page; KPBS; Rules of Practice and Procedure (Rule 1.4, becoming a party; Rule 2.6, protests)
By the numbers
- Voltage
- 500 kVAn overhead line from SDG&E's Imperial Valley Substation to a new 500/230 kV substation north of San Onofre, near the San Diego-Orange County line.
- Length
- 135 to 151 milesSDG&E puts its preliminary corridor at about 151 miles. The CPUC says about 150, CAISO's planning figure is 145, and the Anza-Borrego Foundation says about 135.
- Cost
- $1.6 to $2.3 billionSDG&E estimates about $1.624 billion from preliminary design. CAISO's 2023 estimate of about $2.28 billion covers a wider scope, including the new substation.
- Who pays
- Ratepayers statewideSDG&E says costs are paid by customers across CAISO's system, and SDG&E's own customers would pay about 9%. SDG&E has not published a rate impact.
- Tower height
- 140 to 200 ftSDG&E expects towers to average about 140 to 180 feet, on a right-of-way typically 180 to 200 feet wide. The City of Temecula says up to 191 feet; the Vista Irrigation District says just under 200. Six tower designs are under consideration.
- In service
- 2032SDG&E's target, with construction starting in fall 2029. CAISO's required in-service date is June 1, 2034.
“we find that all routes that would traverse Anza-Borrego are unacceptable”
The road from here
1. Now
SDG&E takes feedback
2. By end of 2026
SDG&E files
3. 30 days after notice
Protests
4. Once it is complete
Scoping, 30 days
5. Later
Draft report, 45 days or more
6. At the end
The vote
What you can do now
Join the CPUC's mailing list for this project
GPP@ascent.inc
Subscribe to CPUC updates
subscribecpuc.cpuc.ca.gov
Ask the CPUC Public Advisor how to take part
public.advisor@cpuc.ca.gov
Everything else, including how to write a comment that counts: stopgoldenpacific.org/take-action